1-3A Doggett Road, Catford

appeal 6004929·Lewisham·11 September 2026allowed
Decision
allowed, 11 September 2026
Decided by
Planning Inspector: H Marriott
Authority
Lewisham (London)
Appeal reference
6004929
Application reference
DC/25/140280
Procedure
written representations
Development
Demolition of 13-bed HMO and erection of 4-storey building with 9 flats and a commercial unit
Homes
9
Site context
inside settlement, PDL, flood zone 3, flood zone 2, near station
Green Belt
No
Housing Delivery Test
65%
Framework applied
August 2026 NPPF
Determinative policies
S3, S4, HO7, L2, L3, F5, F6, DM5
Development plan policies
London Plan 2021 D3, D4, D5, D6, D7, H9, HC1, T5, T6, Lewisham Local Plan 2025 QD1, QD8, QD10, HE3, HO1, HO3, HO8, SD7, TR4, Small Site Design Guidance SPD 2021
Main issues
character and heritage; loss of HMO; affordable housing viability; living conditions; cycle parking; neighbour privacy; flood risk

Summary

A 4-storey building with 9 flats and a café, replacing a poor-quality 13-bed HMO on a corner plot next to Catford Bridge station. Lewisham refused it, and the appeal was allowed. No sequential test had been done, even though part of the site is in Flood Zone 3a. The inspector found conflict with F5 and the plan's SD7, but gave substantial weight to HO7 (HDT 65%) and to L2/L3 PDL reuse. Removing the basement bedrooms was a real flood-safety gain. On that basis the S4 balance favoured approval.

Issues and findings

Planning balance

S3/S4 balance. For the scheme: HO7 substantial weight (HDT 65%), L2/L3 substantial weight for PDL in a sustainable urban location, limited economic weight. Against it: a sequential-test conflict under F5 and SD7, with flood risk actually reduced. "the benefits of approving the proposed development would not be substantially outweighed by any adverse effects" (DL ¶60). Material considerations justified departing from the plan (DL ¶61).

What made the difference

The Council did not defend its reasons. It produced no appeal statement on viability, no conditions and no sequential-test evidence. The inspector also judged the missing sequential test a matter of procedure: much of the surrounding area floods too, so a sequentially preferable site was unlikely, and moving bedrooms out of the basement reduced actual risk. With HO7 plus L2/L3 both at substantial weight on a PTAL 6a PDL site, the S4 bar of "substantially outweighed" could not be met. A greenfield site, or a scheme that increased the number of people exposed to flooding, would probably have failed on F5.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
F5failno sequential test done; site partly FZ3a/FZ2; conflict with F5 and LP SD7, described as "principally one of policy compliance rather than direct flood risk harm" (DL 49-52, 56)
F6passexception-type considerations still relevant; basement bedrooms removed = significant betterment; PDL in highly sustainable location (DL 50)
F7passFRA mitigation, flood warning registration, no EA objection (DL 51)
HE7neutralno harm to settings of NDHAs Catford Bridge Tavern and station (DL 11, 19-20)
DP3passdistinctive building with active frontages on three sides; no conflict with Framework design policies (DL 19-21)
DM7neutralaccessibility/ramp details left to Building Regulations; assume other regimes operate effectively (DL 17, 41)
DM5passunchallenged viability appraisal shows deficit; no affordable housing required despite LP HO3(J) 2-9 unit requirement (DL 29-33)
HO8neutralHO8 requires meeting up-to-date plan affordable requirements, displaced by viability (DL 28, 59)
HO7benefitsubstantialHDT 65% (previously 32%); modest but important contribution (DL 26, 57)
L2benefitsubstantialwith L3, substantial weight to redevelopment of PDL in sustainable urban location (DL 57)
S4passbenefits not substantially outweighed; departure from plan (SD7 conflict) justified (DL 55, 60-61)

Key facts

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.