Land near Fanshawes, Ware Park, Ware

appeal 6006224·East Hertfordshire·28 September 2026dismissed
Decision
dismissed, 28 September 2026
Decided by
Planning Inspector: D Ellis
Authority
East Hertfordshire (East of England)
Appeal reference
6006224
Application reference
3/25/1052/PIP
Procedure
written representations
Development
Permission in principle for 1 to 4 dwellings on undeveloped land in the Green Belt between Hertford and Ware
Homes
4
Site context
green belt, open countryside, rural lane, listed building setting
Green Belt
Yes (grey belt accepted)
Housing land supply
3.4 years
Framework applied
August 2026 NPPF
Determinative policies
GB7(1)(g)(iii), TR3, GB6(2)
Development plan policies
East Herts District Plan 2018 GBR1, DPS2, TRA1, HA1, HA7
Main issues
grey belt; sustainable location; openness; setting of listed buildings; VSC balance

Summary

Permission in principle for up to four homes on open land in the Green Belt between Hertford and Ware. Grey belt and unmet need (3.4 to 3.7 years' supply) were accepted, but limb (iii) failed. The site is 0.72 km and 1.15 km from the edges of the two towns, with services further on, reached along a mostly single-track, unlit lane with no pavement. A Connectivity Tool score of 49, in the 90th percentile for its rural class, did not rescue it. As inappropriate development causing openness harm, substantial weight to housing did not clearly outweigh. Dismissed.

Issues and findings

Planning balance

GB6(2) VSC. Substantial weight to inappropriateness and openness harm, plus great weight to the plan conflict. Housing, economic and social benefits and BNG together attract substantial weight, but "would not attract sufficient weight to clearly outweigh the totality of the harm" (DL ¶33).

What made the difference

The route. The site is close to two towns on a straight-line basis, and the Connectivity Tool ranks it well for a rural hamlet, but the walk and cycle ride are along a single-track unlit lane with no pavement, and the distances are to the town edges, not to services. The inspector treated the tool's relative score as one input and the route quality as decisive. A continuous lit footway or a designated cycle route would have been needed to pass limb (iii).

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
AnnexB:grey-beltpassaccepted by the Council; no contribution to purposes (a), (b) or (d) (DL 9)
GB7(1)(g)(i)passwould not fundamentally undermine the purposes of the remaining Green Belt (DL 9)
GB7(1)(g)(ii)passno five-year supply, so evidenced unmet need (DL 9)
TR3fail0.72 km to the edge of Hertford and 1.15 km to Ware, services further; mostly single-track road with no lighting or pavement; Connectivity Tool 49 (90th percentile for "Rural hamlets and isolated dwellings") outweighed by route quality; EV charging and cycle storage do not cure (DL 10-17)
GB7(1)(g)(iii)failnot a sustainable location, so the (g) exception fails and the scheme is inappropriate (DL 18)
Transitional(2)accordgreatEHDP policies "largely consistent with the Framework"; Annex A paragraph 2 quoted; great weight to conflict with DPS2, TRA1 and GBR1 (DL 19)
GB6(2)failsubstantialinappropriate development plus spatial and visual loss of openness; VSC not shown (DL 21, 33)
HE6neutralthree Grade II buildings at Ware Park, locally listed deer park and Grade II Holy Trinity spire; harm cannot be concluded at PIP stage without siting details (DL 26-27)
S5(5)not-engagedS5 does not apply in the Green Belt; decided under GB6/GB7 (DL 29)
HO7benefitsubstantialup to four homes, "modest but meaningful" contribution; with economic, social and BNG benefits, substantial weight collectively (DL 30, 32)

Key facts

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.