Land to rear of White House Farm (5 Bescar Lane), Bescar, Scarisbrick

appeal 6006286·West Lancashire·14 September 2026dismissed
Decision
dismissed, 14 September 2026
Decided by
Planning Inspector: N Unwin
Authority
West Lancashire (North West)
Appeal reference
6006286
Application reference
2025/0598/PIP
Procedure
written representations
Development
Permission in principle for 4-9 dwellings on a strip of land behind roadside development
Homes
9
Site context
green belt, settlement edge, agricultural land BMV
Green Belt
Yes (grey belt accepted)
Housing land supply
1.86 years
Framework applied
August 2026 NPPF
Determinative policies
S5(5), F5, GB7(1)(g)
Development plan policies
West Lancashire Local Plan 2012-2027 GN1, GN3, EN2
Main issues
flood risk; grey belt; BMV/peaty soils; S5(5) balance

Summary

PIP for 4-9 dwellings on a strip of land behind roadside development at Bescar. The site was agreed grey belt, with unmet need (1.86-year supply) and a sustainable location, so it was not inappropriate under GB7(1)(g). The appeal was dismissed on surface water flood risk: there was no FRA and no sequential test, and that "substantially outweighed" the moderate housing benefit in the S5(5) balance. The appellant's costs claim (costs PDF) was refused.

Issues and findings

Planning balance

The S5(5) route: "Where development would not be inappropriate in the Green Belt, proposals should be approved unless the benefits of doing so would be substantially outweighed by any adverse effects" (DL ¶28). Housing had moderate weight "given the relatively small number of dwellings", and flood risk considerable weight, which "would substantially outweigh the benefits" (DL ¶28-29).

What made the difference

This was not a Green Belt loss. Every GB7(1)(g) limb was conceded or found. The failure was the absence of a sequential test or site-specific FRA for a site with surface water risk. With an FRA showing a safe layout, the exception in F4/F5 for surface-water-only sites would have been available (DL ¶9). The scheme would then very probably have been allowed.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
AnnexB:grey-beltpassagreed not strongly contributing to (a), (b), (d) (DL 19)
GB7(1)(g)(ii)passfn41 — 1.86-year supply is a demonstrable unmet need (DL 20)
GB7(1)(g)(iii)passcouncil agreed sustainable location (DL 21)
GB7(1)(g)passnot inappropriate; complies with LP GN1 (DL 22)
F5failconsiderableparts of site at 1-in-30/100/1000 surface water risk, whole site under climate change per council; no FRA and no sequential test; flood risk is a PIP-stage principle matter (DL 7-14, 29)
S5(5)failnot-inappropriate route leads to "substantially outweighed" balance; flood risk substantially outweighs moderate housing benefit (DL 27-29)
HO7benefitmoderate4-9 homes against 1.86-year supply — "relatively small number" (DL 28)
Local Plan EN2accordnarrow, formerly hard-surfaced strip — no prejudice to Grade 1 / peaty soil supply (DL 23-26)

Key facts

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.