Land adjacent to Cedar Cottage, Furners Lane, Henfield

appeal 6007104·Horsham·24 August 2026allowed
Decision
allowed, 24 August 2026
Decided by
Planning Inspector: Claire Coles
Authority
Horsham (South East)
Appeal reference
6007104
Application reference
DC/24/0535
Procedure
written representations
Development
5 open-market dwellings (2 pairs of semis and 1 detached) with upgraded access onto Furners Lane
Homes
5
Site context
settlement edge, open countryside, TPO
Green Belt
No
Housing land supply
1.7 years
Framework applied
August 2026 NPPF
Determinative policies
S5(1)(j), S6, HO3, AnnexA
Development plan policies
Horsham District Planning Framework 2015 Policies 2, 3, 4, 15, 26, Henfield Neighbourhood Plan 2021 Policies 1, 2, Shaping Development in Horsham District Planning Advice Note 2025
Main issues
suitability of location having regard to the local development strategy

Summary

Five market houses on two fields just outside Henfield's built-up area boundary, next to a site where 191 homes were allowed on appeal. Allowed. The scheme conflicts with the local plan and the Henfield NP. But Horsham has 1.7 years' supply, and S5(j) supports the development. S6 NP protection did not apply because the NP was made on 23 June 2021, more than five years before the decision, and its housing requirement was no longer credible. The Council's own 2025 advice note, which drops the allocation requirement, also weighed "heavily" in favour.

Issues and findings

Planning balance

The development plan conflict had diminished weight: limited for the HDPF, and diminished for the HNP. Five dwellings got "significant weight" at a significant shortfall (DL ¶35). Conclusion: the adverse impacts "would not significantly and demonstrably outweigh the benefits ... As a result, the presumption in favour of sustainable development would apply" (DL ¶48). This is the 2024 tilted-balance wording, not S5's "substantially outweighed".

What made the difference

There were three drivers. First, timing: the NP turned five years old on 23 June 2026, so S6 protection had fallen away by 24 August 2026. Second, the adjacent 191-home permission, which changed the site's context and mitigated its encroachment. Third, the Council's own advice note inviting unallocated edge-of-settlement sites. Had the NP been under five years old, S6 would have made the benefits "likely" to be substantially outweighed.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
S5(1)(j)pass1.7-year supply; proposal complies with national decision-making policies; S5(j) "provides support" (DL 20-23)
S6not-engagedS6(a) fails because the HNP was made 23 June 2021, more than 5 years before the decision; S6(b) met (allocations exceed the 270 requirement); NP requirement no longer a credible indicator of need (DL 28-34)
HO3neutralplan more than 5 years old so supply is measured against local housing need; 20% buffer after significant HDT under-delivery (DL 20)
HDPF Policies 2, 4, 26 and HNP Policy 1conflictlimitedoutside BUAB with no essential countryside need; weight limited by S5(j) and the Council's 2025 PAN, which drops the allocation requirement (DL 11-14, 24-27, 34)
HO7benefitsignificant5 dwellings at a significant shortfall, given "significant" weight (DL 35)

Key facts

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.