Church View, Wilsthorpe Road, Braceborough

appeal 6007771·South Kesteven·17 August 2026dismissed
Decision
dismissed, 17 August 2026
Decided by
Planning Inspector: L N Hughes
Authority
South Kesteven (East Midlands)
Appeal reference
6007771
Application reference
S26/0117
Procedure
written representations
Development
Detached bungalow in side garden at village edge within conservation area
Homes
1
Site context
inside settlement, conservation area, settlement edge
Green Belt
No
Housing land supply
4.07 years
Framework applied
December 2024 NPPF (transitional)
Determinative policies
S3, DP3(3)
Development plan policies
South Kesteven Local Plan 2011-2036 SP2, SP3, DE1, EN6, Design Guidelines for Rutland and South Kesteven SPD
Main issues
character and conservation area

Summary

A garden bungalow at the entrance to Braceborough village and conservation area was dismissed. It was cramped, sat forward of the building line, and caused "less than substantial harm … at the lowest end". The letter is dated 17 Aug 2026 but is written entirely under the 2024 Framework: ¶11(d) with a 4.07-year supply, ¶212 "great weight", ¶215, and the ¶139 "not well designed should be refused" rule.

Issues and findings

Planning balance

2024 tilted balance. A moderate-weight home and minor benefits were outweighed by design harm.

What made the difference

The dwelling's forward position at the village gateway changed the open transition to countryside. Under 2026 this would fall to S4(2)(c) via DP3(3). The outcome would likely be the same, but the "substantially outweighed" test is stricter wording.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
HE6(4)harmgreat2024 wording: "less than substantial harm … at the lowest end of that spectrum" to Braceborough CA gateway; not a strong reason for refusal under 2024 ¶11(d)(i) (DL 8-12, 17-18)
DP3(3)failcited as 2024 ¶¶131, 135, 139 — "development that is not well designed should be refused"; cramped plot, forward of building line, dominant at village entrance (DL 5-6, 21)
S3fail2024 ¶11(d)(ii) — "significantly and demonstrably outweigh" (DL 17-22)
HO7benefitmoderateone windfall home, 4.07-year supply (DL 20)

Key facts

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.