Burnham Grammar School, Hogfair Lane, Burnham

appeal 6008170·Buckinghamshire·9 September 2026allowed
Decision
allowed, 9 September 2026
Decided by
Planning Inspector: K Reeves
Authority
Buckinghamshire (South East)
Appeal reference
6008170
Application reference
PL/25/4954/FA
Procedure
written representations
Development
Appeal against condition 3 (bat and bird boxes) on permission for a freestanding canopy and hardstanding at a school
Site context
inside settlement
Green Belt
No
Framework applied
August 2026 NPPF
Determinative policies
N2(3), N2(1)(f), DM6(1)
Development plan policies
South Bucks Core Strategy 2011 CP9
Main issues
necessity of biodiversity-enhancement condition

Summary

The appeal was against a condition requiring bat and bird boxes on a school canopy. The condition was deleted. The Inspector applied new Policy N2: a general development plan policy cannot require biodiversity gains beyond statutory BNG (N2(3)). The integrated-features expectation in N2(1)(f) was also displaced by "compelling technical reasons" (DL ¶¶7–11). The condition therefore failed the DM6 tests.

Issues and findings

Planning balance

No balance was needed. This was a straight test of the condition's necessity under DM6.

What made the difference

The new N2(3) wording removes local-plan leverage for enhancements above statutory BNG unless an allocation policy requires them. Combined with an accepted BNG metric and a structure that physically could not host boxes, the condition had no footing.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
N2(3)passgains beyond statutory BNG only required via up-to-date allocation-specific policies; general CP9 "cannot be relied upon to require biodiversity enhancements beyond statutory net gain" (DL 7-8)
N2(1)(f)passlightweight polycarbonate canopy is a "compelling technical reason" why integrated boxes would be ineffective; N2 does not support off-site boxes elsewhere in grounds (DL 9-10)
DM6(1)failcondition neither necessary nor reasonable — no ecological impact (DL 12)

Key facts