Land North of A507, West of A10, Buntingford

appeal 6008238·East Hertfordshire·24 September 2026allowed
Decision
allowed, 24 September 2026
Decided by
Planning Inspector: D Hartley
Authority
East Hertfordshire (East of England)
Appeal reference
6008238
Application reference
3/24/0966/OUT
Procedure
inquiry
Development
Outline, access only, for up to 600 dwellings (40% affordable, 1% self-build), 60 elderly units, mixed-use local centre, first school, about 25 ha open space and country park, access from the A507 and bridges over the A10
Homes
660
Site context
open countryside, settlement edge, agricultural land BMV, listed building setting
Green Belt
No
Housing land supply
2.88 years
Framework applied
August 2026 NPPF
Determinative policies
S5(1)(j), S5(1)(j)(i), TR3, Transitional(2), HO7
Development plan policies
East Herts District Plan 2018 DPS2, GBR2, DES2, TRA1, TRA2, ED2, Buntingford Community Area Neighbourhood Plan 2017 HD1, HD2, ES1
Main issues
highway safety of A10 crossing; sustainable location; landscape character; infrastructure; S5 balance

Summary

An inquiry into up to 600 homes plus 60 elderly units, a local centre and a country park on 50 ha of arable land west of the A10 at Buntingford, East Hertfordshire. The site is outside the settlement but was found "physically well related" under S5(1)(j)(i), because the A10 runs largely in cutting and the scheme adds bridges and a toucan crossing. Supply is 2.21 to 2.88 years. A package of lit paths, bridges, a shared route and in-site bus services passed TR3. Limited landscape, PROW, BMV and low-level Grade II* setting harm did not substantially outweigh the "very substantial" benefits. Allowed.

Issues and findings

Planning balance

S5(1): approve unless the benefits are substantially outweighed. Benefits: "very substantial" collectively (DL ¶163), with substantial weight to each housing element, moderate weight to BNG, sports, open space, transport contributions and economic benefits, and limited weight to community facilities and PROW 36. No weight to the first school, which is not needed. Harms: limited landscape and PROW harm, limited BMV loss, limited weight to the heritage harm and limited weight to the plan conflict. "the benefits associated with the proposed development would not be substantially outweighed by the identified adverse effects" (DL ¶167). s38(6): material considerations outweigh the plan conflict (DL ¶171).

What made the difference

Two things. First, an acute supply shortfall (under 3 years against a much higher new requirement, with no new plan before 2029) and a plan whose countryside policies conflict with S5. Second, an unusually complete active-travel and bus package, tested line by line at inquiry (crossing design, lighting, surveillance, island widths, cycle dismount points). A weaker transport package, or a finding that the A10 was a hard edge, would have failed S5(1)(j)(i) or TR3.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
AnnexB:settlementnot-engagedsettlement taken as the LP settlement boundary, mostly the eastern edge of the A10; site outside it (DL 14)
HO11not-engagedcommon ground that the scheme is not isolated homes (DL 15)
S5(1)(j)passsupply 2.21 to 2.88 years, so evidenced unmet need; scale accommodated with the s106 infrastructure (DL 17-19)
S5(1)(j)(i)passphysically well related despite the A10, which is largely in cutting and read as "a soft connection"; bridges, toucan crossing, intervisibility with Neale Drive, adjacent business park and allocation (DL 20-24)
Transitional(2)conflictlimitedDPS2, GBR2 (Rural Area Beyond the Green Belt) and NP HD1 "materially inconsistent" with S5; Annex A paragraph 2 quoted ("very limited weight") but "limited adverse weight" given; reasoning also cites the out-of-date housing requirement and lack of supply (DL 25-29, 165)
S6not-engagedneighbourhood plan made in 2017, more than five years old (DL 27)
TR6passstaggered shared toucan crossing on the A10 (option 2) with new 40 mph limit accepted despite guidance against shared staggered islands; 85th percentile about 30 mph; guard rails; no severe cumulative impact (DL 33-58)
TR3passservices within 2 km; Connectivity Tool 45, district band B; lit and widened PROW 35/36, new stepped footbridge and active-travel bridge, shared route on Baldock Road, bus services 331 (30-minute), 18 and 37 into the site, travel plan; "genuine choice" found (DL 59-94)
TR8harmlimitedlimited localised harm to users' experience of PROW 40 and 41 (DL 121, 164)
N2(1)(a)harmlimitedlimited localised landscape harm at year 15 to LCA 141 (medium value), built form kept off the plateau and ridge (DL 113-122, 126)
DP3(1)not-engagedheld to govern on-site scale, layout, landscaping and appearance, not effects on landscape character (N2 covers that); in the alternative a DP3(1) conflict would still be outweighed under S5(2) (DL 123-125, 168-169)
N2(1)(b)harmlimitedloss of BMV land, common ground (DL 130-131)
HE6(4)passGrade II* Holy Trinity Church about 1 km west; harm at the lower end of the spectrum (DL 135); letter uses 2024 "great weight" wording (DL 132) and gives the harm "limited adverse weight" (DL 164), not HE6(3) considerable importance and weight; public benefits "clear and convincing justification to outweigh the harm" (DL 132-135)
TC3passsequential test passed for the local centre (DL 136)
HO7benefitsubstantialsubstantial weight to each of market homes, affordable homes, elderly homes and self-build, disaggregated with reference to HO1 (DL 30, 138-139)
HC4(1)benefitlimitedlocal centre, sports facilities and country park given limited weight despite HC4(1) "substantial" wording (DL 147)
DM7(2)neutralno off-site foul and water supply conditions, as water companies have statutory duties; not duplicating other regimes (DL 151-154)
S5(1)passvery substantial collective benefits not substantially outweighed; Framework given very significant weight; s38(6) departure (DL 163-171)