Land East of College Road South, Aston Clinton

appeal 6008253·Buckinghamshire·24 September 2026allowed
Decision
allowed, 24 September 2026
Decided by
Planning Inspector: Zoe Raygen
Authority
Buckinghamshire (South East)
Appeal reference
6008253
Application reference
25/02250/AOP
Procedure
hearing
Development
Outline (access only) for up to 66 dwellings with open space, SuDS and landscaping on three fields at the northern edge of Aston Clinton
Homes
66
Site context
settlement edge, open countryside, listed building setting
Green Belt
No
Framework applied
August 2026 NPPF
Determinative policies
S5(4), HO7, DP3(3), HO13
Development plan policies
Vale of Aylesbury Local Plan 2013-2033 (2021) S1, S2, S3, S8, D3, NE4, BE2, Aston Clinton Neighbourhood Plan 2018 H1, emerging Buckinghamshire Local Plan (Reg 19) AST01
Main issues
character and appearance including settlement pattern; setting and coalescence; location outside the settlement boundary

Summary

Outline permission for up to 66 homes on three fields at the northern edge of Aston Clinton was granted after a hearing. The inspector found moderate harm to character and limited harm to the village's setting, but no coalescence with Aylesbury. That harm meant the site was not "physically well related" under S5(1)(j)(i), so the scheme fell to S5(4). With a substantial supply shortfall, 25% affordable housing and an emerging strategic allocation covering the site, the benefits substantially outweighed the harm, and the same benefits gave clear justification for the DP3 conflict. This is a rare S5(4) pass.

Issues and findings

Planning balance

S5(4) exceptional-circumstances balance, run with the benefits needing to substantially outweigh the harm. Then DP3(3), with clear justification read as the benefits outweighing the harm. Plan-led conclusion: conflict with the plan as a whole outweighed by material considerations, "including the Framework which is a material consideration of critical importance" (DL ¶87).

What made the difference

Three things together: a substantial and worsening supply shortfall (the plan turned five years old during the appeal), the Council's own emerging allocation of the wider area for 1,660 homes, and a site enclosed on two sides by the village with no coalescence effect. Without the allocation the moderate character harm might have weighed more heavily, and the location was accepted as accessible without a route test.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
DP3(1)conflictmoderatemoderate character harm and limited harm to settlement pattern and setting of Aston Clinton; no coalescence with Aylesbury; harm from the change of use, not design (DL 23, 25, 28-31, 78)
DP3(3)passexplicit - "the substantial benefits are sufficient to provide clear justification for the conflict with Policy DP3" (benefits reading) (DL 86)
S5(1)(j)passevidenced unmet need agreed; infrastructure capacity met via s106 (DL 79)
S5(1)(j)(i)failvery close to the settlement, accessed from it and near services, but "not physically well related" because of character and setting harm (DL 80)
S5(4)passexceptional circumstances; substantial benefits substantially outweigh moderate countryside harm (DL 81, 85)
HO7benefitsubstantial66 homes against a substantial supply shortfall (DL 82)
HO8benefitsubstantialpolicy-compliant 25% affordable secured by s106 (DL 41, 82)
HO13passsite lies within emerging Reg 19 strategic allocation AST01 (1,660 homes); no evidence the scheme would prejudice the allocation's scale, location, phasing or masterplanning (DL 73-77)
DM4neutrallimitedemerging allocation limited weight but reinforces that character harm is only moderate (DL 74, 78)
HE6neutralno harm to Grade II Sunnybrook Farm (setting already engulfed) or 1-6 Ballards Row (DL 43-47)
N4passChilterns National Landscape conserved; read as a small extension to the village (DL 60)
N6passChilterns Beechwoods SAC - appropriate assessment; SANG and SAMM secured; no adverse effect on integrity (DL 54-59)
TR6passLHA-agreed TA; no severe capacity or unacceptable safety impact; Green End Street footway to be considered by condition (DL 48-50)
TR3passmapped - "agreed accessible location"; "well located in terms of facilities and services"; TR3 not cited; bus contribution and off-site highway works secured (DL 41-42, 57, 80)
LP S1 (local)conflictsubstantialsaid to be "out of date due to the lack of five year housing land supply" but in broad accordance with the Framework, so landscape conflict given full weight (DL 36)
LP S2/S3/D3/NP H1 (local)conflictlimitedspatial-strategy conflict given limited weight because the supply shortfall is substantial (2024-style out-of-date reasoning, no Annex A(2) test) (DL 38-39)

Key facts

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.