Land at Mushroom Lane, Brigsley (outline, nine dwellings)

appeal 6009363·North East Lincolnshire·1 October 2026dismissed
Decision
dismissed, 1 October 2026
Decided by
Planning Inspector: P Eggleton
Authority
North East Lincolnshire (Yorkshire and the Humber)
Appeal reference
6009363
Application reference
DM/0749/25/OUT
Procedure
written representations
Development
Outline permission (access only) for nine dwellings and garages on a 1.3 ha field
Homes
9
Site context
settlement edge, open countryside
Green Belt
No
Framework applied
August 2026 NPPF
Determinative policies
L3(4), S5(2), TR3(1)(a), N2(1)(a)
Development plan policies
North East Lincolnshire Local Plan 2018 Policy 3, Policy 5, Policy 22
Main issues
sustainable location; effective use of land; character and appearance

Summary

Outline permission for nine houses on a 1.3 ha field next to Brigsley's development boundary was dismissed. With no five-year supply, the site met S5(1)(j) as physically well-related to the settlement, and nine homes had substantial weight. But at 6.8 dwellings per hectare the scheme did not make effective use of land, and L3(4) says such proposals should be refused. That engaged S5(2). With a poorly connected location and landscape harm each given considerable weight, the benefits were substantially outweighed.

Issues and findings

Planning balance

S5(1) with S5(2): "These conflicts, particularly but not limited to Framework Policy L3, represent the circumstances, set out in Framework Policy S5(2), in which the benefits of approving development proposals are likely to be substantially outweighed by the adverse effects." (DL ¶24). Substantial weight to nine homes and considerable weight to social and economic benefits, with biodiversity and tree planting in support, against the L3 refusal policy and considerable weight each to the TR3 conflict and the landscape harm.

What made the difference

Density. The site passed the S5(1)(j) gateway and the housing benefit had full weight, but nine houses on 1.3 ha could not be called the best use of the site's potential, and the appellant gave no net density figure. The inspector raised L3 after the Framework changed. A denser scheme would have removed the refusal policy, though it would have sharpened the landscape and location objections, which also carried considerable weight.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
S5(1)(j)(i)passletter says "S5(1ji)"; no five-year supply, and the site adjoins the development boundary, so physically well-related to an existing settlement; the scale and infrastructure limb is not addressed (DL 5, 22)
L3(2)(b)failletter says "L3(2b)"; 6.8 dwellings per hectare gross over 1.3 ha, and a very low net density even after excluding open space, biodiversity area, swales and pond (DL 7-9)
L3(4)failnot an effective use of land, so the policy says the development should be refused (DL 9, 23)
S5(2)failconflict with L3, a "should be refused" policy, with the TR3 and N2 conflicts, means the benefits are likely to be substantially outweighed (DL 6, 24)
DP3(3)not-engagedcharacter harm found, but with design reserved there is no clear conflict with DP3 that would trigger refusal (DL 12)
N2(1)(a)harmconsiderableletter says "N2(1a)" and "N2(a)"; development of the open field harms the character and appearance of the area, as the inspector in an earlier appeal on the site found (DL 10-11, 23)
TR3(1)(a)failconsiderableletter says "TR3(1a)"; no services within 500 m; Brigsley's limited services 500 to 1,000 m away along a narrow unlit footpath; Waltham's services beyond 1,000 m; no bus frequency evidence; Connectivity Tool results consistent with poor connectivity (DL 13-17, 23)
AnnexB:reasonable-walking-distancefailthe 800 m definition applied to walking to services generally, although Annex B frames it for the station policies and HC5 (DL 14)
HO7benefitsubstantialnine homes where supply is significantly below that required (DL 18, 21)
N2(1)(e)benefitletter says "N2(c-g)"; green infrastructure, biodiversity gain above the statutory requirement and tree planting (N3) support the scheme (DL 19, 21)
Transitional(2)conflictvery-limitedPart 3 of Local Plan Policy 5 inconsistent with the Framework, very limited weight; the Framework policy it conflicts with is not named (DL 4)
Transitional(2)accordPart 1 of Policy 5 (suitability and sustainability criteria) and Policy 22 generally consistent and given full weight (DL 4, 9, 19)
S5(1)failbenefits substantially outweighed by the adverse effects (DL 24)

Key facts

Sources