Land north east of 7 Redmoor Lane, Wisbech

appeal 6010682·Fenland·7 September 2026dismissed
Decision
dismissed, 7 September 2026
Decided by
Planning Inspector: R Gee
Authority
Fenland (East of England)
Appeal reference
6010682
Application reference
F/YR26/0184/F
Procedure
written representations
Development
Retrospective change of use of land to domestic purposes, siting of a static caravan and erection of a shed
Homes
1
Site context
open countryside, flood zone 3
Green Belt
No
Framework applied
August 2026 NPPF
Determinative policies
F5, S5(2), S5(1)
Development plan policies
Fenland Local Plan 2014 LP1, LP3, LP12, LP14, LP16, Cambridgeshire Flood and Water SPD 2016
Main issues
suitable location; character and appearance; flood risk

Summary

Retrospective application for a static caravan, shed and change of use of land to domestic use on a smallholding in Flood Zone 3a outside Wisbech. Dismissed. No essential rural-worker need was evidenced, the domestication harmed rural character, and the proposal failed the F5 sequential test. The inspector used S5(2) to treat the flood-policy failure as decisive and did not go on to the S5(4) exceptional-circumstances balance.

Issues and findings

Planning balance

S5 route: the proposal is not in any S5(1) category (DL ¶36). "I have found that the proposal fails the Sequential Test and therefore conflicts with the Framework's flood risk policies. As those policies provide a strong reason for refusal, I conclude that the proposal does not satisfy NDMP S5. In these circumstances, there is no need for me to undertake any further assessment as to whether exceptional circumstances exist under S5(4)" (DL ¶37). Personal/health circumstances limited weight for lack of evidence (DL ¶31). Plan-led s38(6) conclusion (DL ¶38).

What made the difference

Flood Zone 3a with an EA objection and no evidenced need to be on this specific site. Once the rural-worker case failed for lack of evidence about the holding, nothing tied the caravan to the location, so the sequential test could not be passed, given FZ1/2 sites with permissions elsewhere in the district. Robust functional-need evidence (stock numbers, labour requirement) and a better FRA addressing breach risk would have been needed even to get to the exception test.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
F5failFZ3a; no essential need to be on this site; extant permissions exist in FZ1/2; whole proposal incl. shed assessed (DL 19-28)
F7failexception test not reached, but EA concerns on residual breach risk (0.25-0.5 m depth, "danger for some") weigh against safe-for-lifetime finding (DL 24, 29)
Annex Fneutralpermanent residential mobile home on land changed to residential use is "highly vulnerable", not "more vulnerable"; not householder development (DL 23)
S5(1)failnot within any S5(1) category; rural-worker essential need not evidenced (DL 11-13, 36)
S5(2)failflood policy failure treated as S5(2) refusal circumstance; S5(4) exceptional circumstances then not assessed (DL 36-37)
HO11not-engagedproximate to existing built form so not isolated, but that does not overcome plan conflict (DL 13)
DP3harmnot cited as DP3; domestication of undeveloped field and paraphernalia harm rural character, conflict with LP12/LP16 (DL 15-18)

Key facts

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.