- Decision
- dismissed, 7 September 2026
- Decided by
- Planning Inspector: P Barton
- Authority
- Stoke-on-Trent (West Midlands)
- Appeal reference
- 6010701
- Application reference
- 25/OUT/00727
- Procedure
- written representations
- Development
- Outline for three dwellings in the garden of 96 Church Road (access for approval)
- Homes
- 3
- Site context
- inside settlement, TPO
- Green Belt
- No
- Housing land supply
- 3.73 years
- Framework applied
- August 2026 NPPF
- Determinative policies
- S4(2)(a)(ii), L2(1)(d), S4(2)(c), DP3(3), N2(1)(f)
- Development plan policies
- Newcastle-under-Lyme and Stoke-on-Trent Core Spatial Strategy 2006-2026 CSP1, CSP4
- Main issues
- character; protected species; highway safety
Summary
Three houses in a large, well-treed garden on a spacious stretch of Church Road, Blurton, including two in a backland position reached by a new access. Appeal against non-determination, dismissed. The supply was 3.73 years and housing had substantial weight. But the inspector found two S4(2) triggers: S4(2)(a)(ii), a "substantial adverse impact" under L2(1)(d) (visible, out of keeping, under 50% of undeveloped curtilage retained, more than double the footprint), and S4(2)(c) via DP3(3). Inconsistent bat surveys added an N2(1)(f) failure.
Issues and findings
- Transition. Parties commented (DL ¶2).
- Character: significant harm. "the introduction of houses behind No. 96 would result in a level of development where there is currently nothing of that nature … Consequently, the development to the rear of the site would appear incongruous" (DL ¶10).
- Bats. "I cannot conclude with reasonable certainty that the correct trees with a low potential for roosting bats have been appropriately surveyed" (DL ¶22).
- L2(1)(d) / S4(2)(a)(ii). "the appeal scheme would be visible from the street frontage and would not be consistent with the overall street scene … less than 50% of the non-developed area would be retained … more than twice the footprint … it represents a substantial adverse impact" (DL ¶34).
- S4(2)(c). "Policy S4(2)(c) applies as the proposal fails to comply with Policy DP3(3)" (DL ¶35).
Planning balance
S4. For the scheme: substantial weight to three homes with a 3.73-year supply, plus BNG and economic benefits (DL ¶31). Against: substantial weight to the DP3(1) and N2(1)(f) conflicts (DL ¶32), plus both S4(2) triggers. "the presumption … does not apply" (DL ¶36).
What made the difference
The L2(1)(d) numeric criteria (50% of undeveloped area, twice the footprint) gave the inspector an objective hook for a "substantial adverse impact" finding under S4(2)(a)(ii). Combined with DP3(3), this outweighed a significant shortfall. A single frontage plot keeping most of the garden open would have been far stronger.
Transferable points
- The L2(1)(d) criteria (street-frontage visibility, 50% undeveloped area retained, footprint doubling) are used to decide whether S4(2)(a)(ii) is triggered (DL ¶33-34).
- S4(2)(a)(ii) and S4(2)(c) can be triggered together, and together they outweigh HO7 substantial weight even with a 3.73-year supply (DL ¶31-36).
- Inconsistent ecology reports (surveyed trees that do not match the roost assessment) are a free-standing N2(1)(f) failure (DL ¶20-22).
Policy findings
Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.
| Policy | Finding | Weight | Note |
|---|---|---|---|
| L2(1)(d) | fail | visible from street, inconsistent with street scene, under 50% of undeveloped curtilage retained, more than twice existing footprint - a "substantial adverse impact" (DL 33-34) | |
| DP3(3) | fail | substantial | backland plots and wide access road incongruous in a spacious verdant stretch; S4(2)(c) engaged (DL 7-18, 35) |
| N2(1)(f) | fail | substantial | bat survey inconsistencies (trees surveyed do not match PBRA); effect on roosting bats unknown (DL 19-23, 32) |
| HO7 | benefit | substantial | three homes, supply 3.73 years, sustainable location (DL 31) |
| TR6(4) | pass | fire-tender swept paths show access acceptable (DL 24-26) |
Key facts
- Council supply 3.73 years
- 7 trees removed, 2 TPO (category C); moderate canopy harm
- Non-determination appeal
Sources
This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.