The Rising Rest Home, Primrose Lane, Simmondley, Glossop

appeal 6011027·High Peak·4 September 2026dismissed
Decision
dismissed, 4 September 2026
Decided by
Planning Inspector: J Buxton
Authority
High Peak (East Midlands)
Appeal reference
6011027
Application reference
HPK/2025/0423
Procedure
written representations
Development
Single storey side extension to residential care home (communal, sanitary and office space)
Site context
inside settlement
Green Belt
No
Framework applied
August 2026 NPPF
Determinative policies
DP3(1)
Development plan policies
High Peak Local Plan 2016 S1, EQ6, High Peak Design Guide
Main issues
character and appearance

Summary

A care-home side extension, dismissed on design grounds. The roof form and fenestration were awkward, and the extension would widen the building in public views. The inspector used DP3(1) language ("integrate with or enhance") without naming the policy. The harm was weighed in a balance: "substantial" adverse effects against "significant" weight for operational benefits (DL ¶9, 14, 17). DP3(3) "should be refused" was not used as a trump.

What made the difference

Poor architectural relationship to the host building. "the fact that a design may successfully fulfil a functional purpose does not necessarily mean that it represents good design" (DL ¶15).

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
DP3(1)failsubstantialdual-pitched roof and fenestration do not relate to host; "does not integrate with or enhance either the host building or its surroundings" (DP3(1) language, policy not named); adverse effects "substantial"; balance run against significant-weight benefits — no DP3(3) "should be refused" wording (DL 7-9, 17); code mapped by harvester
HO9benefitsignificantcare-home operational, infection-control and accessibility improvements; "efficient use of the land" (DL 6, 14, 17); code mapped by harvester

Key facts

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.