West Court Land, Park Lane, Finchampstead (telecoms lattice mast, prior approval)

appeal 6011060·Wokingham·2 October 2026dismissed
Decision
dismissed, 2 October 2026
Decided by
Planning Inspector: A Tucker
Authority
Wokingham (South East)
Appeal reference
6011060
Application reference
252762
Procedure
written representations
Development
Prior approval (GPDO Part 16 Class A) for a slimline lattice mast with 3 aerials, 2 transmission dishes, a GPS aerial and radio equipment housing, to replace apparatus about 1 km away
Site context
open countryside, TPO
Green Belt
No
Framework applied
August 2026 NPPF
Determinative policies
CO2(1)(b)
Development plan policies
Wokingham Borough Core Strategy CP3, CP6, CP8, CP11, Managing Development Delivery Local Plan 2014 CC03, TB21, South East Plan saved NRM6
Main issues
siting and appearance; protected trees; highway safety; alternative sites

Summary

Prior approval for a telecommunications mast in a protected woodland belt beside parkland that serves as Suitable Alternative Natural Greenspace (SANG). The inspector found a significant adverse effect from siting and appearance and no information on the protected trees. Substantial weight to network benefits under CO1 was acknowledged, but the CO2(1)(b) evidence on alternative sites was too thin. Dismissed.

Issues and findings

What made the difference

The alternatives evidence. Two nearby sites outside the Tree Preservation Order and the SANG were dismissed by the appellant for reasons the inspector could not follow, and the appellant said it was working on a different solution. With significant visual harm and no tree evidence, CO1's substantial weight was not enough.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
CO2(1)(b)failletter says "Policy CO2 1. b."; evidence on alternative sites not sufficient to show they were thoroughly considered; an unwilling landowner is a constraint but "not one that is unsurmountable"; appellant also working towards a different solution (DL 21-24, 26)
CO1benefitsubstantialletter says "Policy C01"; substantial weight to maintaining or improving network coverage, capacity, reliability and resilience acknowledged, but not enough without evidence on alternatives (DL 26)
DP3harmmapped: Framework design policy not cited; siting and appearance would have a significant adverse impact - engineered tower above the canopy of a woodland belt beside historic parkland that is a SANG; TPO woodland impact not assessed (DL 9-17)
TR6passmapped: no harm to highway safety from construction or occasional maintenance visits (DL 18-20)

Key facts

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.