Parcel 0014, Charlton Road, Keynsham

application 25/04952/EOUT·Bath and North East Somerset·2 September 2026approved
Decision
approved, 2 September 2026
Decided by
Council planning committee: B&NES Planning Committee (vote 5-4; delegated to permit subject to S106)
Authority
Bath and North East Somerset (South West)
Application reference
25/04952/EOUT
Procedure
committee
Development
Outline (EIA), up to 200 dwellings, Class E unit, open space, landscaping; access from Charlton Road
Homes
200
Site context
green belt, settlement edge, conservation area
Green Belt
Yes (grey belt accepted)
Housing land supply
2.5 years
Framework applied
August 2026 NPPF
Determinative policies
GB7(1)(g), GB8, S5(5), TR3, DM4
Development plan policies
B&NES Core Strategy CP8, CP9, Placemaking Plan DW1, KE1, RE5, NE2, emerging Local Plan Reg 18 West Keynsham option
Main issues
grey belt; sustainable location; Golden Rules; S5(5) balance; prematurity

Summary

Outline permission for up to 200 homes (45% affordable) on a greenfield Green Belt parcel on the edge of Keynsham, in an authority with a 2.5-year supply. Officers treated the site as grey belt even though the strategic WECA assessment rated the wider parcel "significant" on purposes (a) and (b). They assessed the site on its own: contained, not an incongruous finger, and a small part of the Keynsham–Bristol gap. They passed every GB7(1)(g) limb, with the Golden Rules uplift taking affordable housing from 30% to 45%. They then ran the S5(5) "substantially outweighed" balance and recommended approval. Members agreed 5-4.

Issues and findings

Planning balance

S5(5). Harms: location outside the housing development boundary (limited weight, "given the lack of a five-year housing land supply"), landscape (moderate), heritage harm to Queen Charlton CA (limited). Benefits: housing (substantial), affordable housing (very substantial), sustainable location (substantial), off-site highway works (significant, "substantial-moderate"), economic (moderate), green infrastructure (moderate), emerging plan option (limited). "it is not considered that the identified adverse impacts … would substantially outweigh the benefits" (Report, Conclusion).

What made the difference

Officers assessed the grey belt question at site scale rather than strategic-parcel scale, and a site-specific pass on (a) and (b) carried the scheme into S5(5). There the 2.5-year supply and 45% affordable housing were decisive. Sustainable location did real work: the Highway Authority explicitly tied its acceptance to the grey belt test and extracted about 1 km of walking and cycling upgrades. The 5-4 vote shows members were uneasy about sprawl and the 25-minute walk. The new Consultation Direction referral risk was put to members before they voted.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
AnnexB:grey-beltpassWECA 2022 parcel 82 'significant' to (a),(b) but site is small part; adjoins Keynsham, contained by Charlton Road/PRoW/vegetation, no further west than trading estate → (a) moderate; small part of Keynsham–Bristol gap → (b) not strong; Queen Charlton a village → (d) nil
GB7(1)(g)(ii)pass2.5-year supply
GB7(1)(g)(iii)passsubstantialedge of Keynsham, c.25 min walk to town centre, buses, DfT connectivity rating B ('well connected'), c.1 km upgraded walking/cycling route and crossing secured; LHA said sustainability 'critical'
GB8passsubstantial45% affordable (30% + 15 points), highway and education contributions, accessible green space; affordable given 'very substantial' weight
S5(5)passharms (limited/moderate/limited) do not substantially outweigh benefits; S5(2) not triggered
DM4passplan at Reg 18, not advanced; prematurity refusal not justified
HE6harmlimitedless-than-substantial harm to Queen Charlton Conservation Area, outweighed
N2neutralGrade 4 land, BMV loss not engaged

Key facts

Related decisions

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.