Ardencroft, Cloweswood Lane, Earlswood

application 26/01614/FUL·Stratford-on-Avon·24 September 2026refused
Decision
refused, 24 September 2026
Decided by
Council officer (delegated): Case officer Lindsey Young
Authority
Stratford-on-Avon (West Midlands)
Application reference
26/01614/FUL
Procedure
householder
Development
Two-storey side and rear extension and remodelling of a detached house
Site context
green belt, washed over village, valued landscape
Green Belt
Yes (grey belt not argued)
Framework applied
August 2026 NPPF
Determinative policies
GB6(2), GB7(1)(b), GB7(1)(e), AnnexB:PDL
Development plan policies
Stratford-on-Avon Core Strategy 2016 CS.6, CS.9, CS.10, CS.12, CS.20, Tanworth-in-Arden NDP BE1
Main issues
Green Belt inappropriateness; disproportionate extension; previously developed land; fallback; settlement definition

Summary

A householder refusal in Earlswood, a village washed over by the Green Belt, issued under delegated powers on 24 September 2026. A two-storey side and rear extension would take the house from about 374 m3 to about 970 m3. The officer held that to be a disproportionate increase under GB7(1)(b), rejected the applicant's alternative case under GB7(1)(e) because a garden within a built-up area is not previously developed land, and found no very special circumstances. The report opens by applying the Annex B definition of settlement: the site is not within a settlement because it is in the Green Belt. The report is a scanned image and was read by OCR; page numbers are PDF pages.

Issues and findings

Planning balance

GB6(2) very special circumstances. Harm by inappropriateness, given substantial weight, plus moderate harm to openness. On the other side: the permitted development fallback (limited weight), the retention of original fabric and the design benefit of consolidating additions into one form. "Taken individually and cumulatively, these considerations are not considered sufficient to clearly outweigh the harm to the Green Belt by reason of inappropriateness and the identified harm to openness" (p.9).

What made the difference

Volume. A 159% increase over the original dwelling could not be called proportionate, and the applicant's fallback, once the wrap-around side extension was removed from it, still left the scheme 22% larger than what could be built without permission. The alternative route through previously developed land failed at the definition: the officer placed the garden inside a built-up area because the house stands in a row that "clearly forms part of the village".

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
AnnexB:settlementfail"the application site is not considered to be within a settlement because it lies within the Green Belt" (p.2); the Annex B exclusion of washed-over villages applied in terms
S5(5)not-engagedS5 "does not apply to development proposals within the Green Belt"; assessed under GB6 and GB7 (p.2); the scheme was inappropriate, so no S5(5) balance
GB7(1)(b)failoriginal dwelling about 374 m3, proposed about 970 m3, an increase of about 596 m3 or 159%; "clearly a disproportionate increase" (p.3); the notice writes "GB7(b)"
AnnexB:PDLfailthe garden is "within a built-up area" (a row of houses forming part of the village), so it is excluded from the definition of previously developed land (p.3)
GB7(1)(e)failnot PDL, and an extension is not "redevelopment" (p.8); the officer was also not satisfied that it "would avoid substantial harm to the openness" (p.10); the report and notice write "GB7(e)"
GB6(2)failsubstantialinappropriate; "some moderate harm to the openness" (p.4); fallback and design benefits "not considered sufficient to clearly outweigh the harm" (p.9)
DP3passdesign acceptable; the remodelled house "would not appear incongruous" in a varied street (p.4)
Transitional(2)accord"These elements of GB6 and GB7 are considered to be materially consistent with policy CS.10" (p.3); contrast SDC housing reports, which call CS.10 materially inconsistent

Key facts