Land at OS 9294 4914, Stonebow Road, Drakes Broughton (50 dwellings)

application W/26/01322/OUT·Wychavon·2 September 2026refused
Decision
refused, 2 September 2026
Decided by
Council officer (delegated): Jack Hanly (case officer); authorised Clare Bull
Authority
Wychavon (West Midlands)
Application reference
W/26/01322/OUT
Procedure
delegated
Development
Outline, access only, for 50 dwellings including 20 affordable
Homes
50
Site context
open countryside, settlement edge
Green Belt
No
Framework applied
August 2026 NPPF
Determinative policies
S3(1)(a), S5(1)(j), S5(4), DP3(3), TR3, TR6(4), N2
Development plan policies
South Worcestershire Development Plan Review 2026 SWDPR01, SWDPR03, SWDPR05, SWDPR06, SWDPR10, SWDPR28, SWDPR30, SWDPR34, Drakes Broughton and Wadborough with Pirton NP 2017 DBWP1, DBWP3, Wychavon Design Code SPD 2026
Main issues
principle outside settlement; S5 with a five-year supply; character; access; BNG

Summary

An outline for 50 homes (40% affordable) on fields next to Drakes Broughton, outside the development boundary. With a new local plan and a five-year supply, the officer held that S5(1)(j) was simply unavailable, treated the scheme under S5(4) "exceptional circumstances", and refused under delegated powers. The location was found "relatively sustainable" under TR3. The decisive harms were the S5 principle, countryside encroachment under DP3 and a string of technical gaps.

Issues and findings

Planning balance

The S5(4) exceptional-circumstances test was applied: "should only be approved in exceptional circumstances, where the benefits of the proposal would substantially outweigh the adverse effects". The officer listed ten adverse effects and set against them homes (HO7), construction benefits and local spend. "However, as outlined above the Council is able to demonstrate a five-year housing land supply … it is not considered that the benefits of the proposal would substantially outweigh the adverse effects" (Planning Balance).

What made the difference

The five-year supply shut the S5(1)(j) gateway. That moved the scheme from "approve unless substantially outweighed" to "refuse unless benefits substantially outweigh", which is a reversed burden. A walkable location passing TR3 did not rescue it. Without a supply, S5(1)(j)(i) ("physically well-related", "scale … accommodated") would have been the test, and the building-line and encroachment points would have been argued under "well-related" instead.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
S5(1)(j)not-engagedwith a five-year supply (July 2026 report, 20% buffer), "none of the types of development set out within policy S5 are applicable"
S5(4)failno exceptional circumstances; the benefits do not "substantially outweigh" the adverse effects
TR3pass"relatively sustainable location". Shop 643 m, first school 965 m, village hall 804 m, all within the 2 km CIHT walking figure; school-run buses 321 m away; better bus stops about 1 km
DP3(3)fail"unwarranted and conspicuous encroachment" into open countryside beyond the village's northern building line; substantial weight to compliance with plan design policies (Design Code SPD 2026)
TR6(4)failinsufficient access information (closure of the existing access, fire appliances, visibility), so a severe impact is not ruled out
HO7benefit"substantial weight" to homes is recited, but the five-year supply and temporary economic benefits reduce it in the S5(4) balance