Route decision · no settlement tier cited
28 affordable homes on a grey belt field next to Hatton Station, a small West Midlands Green Belt settlement, 350 m from a railway station reached along unlit Station Road with no footway. Dismissed after a hearing. The site failed GB7(1)(g)(iii): 28 homes would generate significant movement in this context, the location did not limit the need to travel, and the route to the station was unsafe for pedestrians. It also failed GB8(1)(b), because the necessary local highway improvements were not secured. The station fell short of the "well-connected station" definition, so GB7(1)(h) was not available. Very significant weight to affordable housing (1.96 years' supply) did not clearly outweigh the Green Belt harm.
The walking route to the station. The site was close to a railway station, but the 350 m route was an unlit, narrow road with no footway and a pinch-point bridge, so the station's proximity did not deliver a genuine choice of modes. Low traffic speeds and volumes, no collision record, and observed pedestrian use did not carry the day. Failure on that one point also knocked out GB8(1)(b), because the pedestrian safety improvements were not secured. The appellant would have needed a deliverable, secured footway or equivalent segregated route to the station (via s278 or a Grampian condition with the Highway Authority's support), plus certainty over any speed limit change.