X · Search match excluded: services mentioned, tier not referenced
—
“walking to the local services”
Permission in principle for one self-build home on grassland next to a small cluster of buildings west of Roche, beyond the new A391 bypass. Dismissed. Cornwall's supply was 3.9 years and HO7 carried substantial weight. But the site was not physically well-related to Roche, so S5(1)(j) did not apply. Building next to the last house would *extend* the group rather than infill within it, so S5(1)(e) failed. The walking route (900 m, unlit, no footway, then an unsignalised four-lane crossing at a roundabout) was a TR3 failure given substantial weight, and S5(4) was not met.
This decision was picked up by the search on the words above, which refer to services, not to a settlement tier. no tier; route (A391 roundabout) decided.
Decision on the Planning Inspectorate appeals service · full decision note · letter pins-corpus/6010442.txt