X · Search match excluded: services mentioned, tier not referenced
—
“capacity of local services such as”
Outline proposal for up to six dwellings on an open field next to the M25, offset by removing nearby commercial buildings. Dismissed. Grey belt and unmet need were agreed, but the site failed GB7(1)(g)(iii): it scored poorly on the Connectivity Tool, had no public transport, and was reached by unlit rural roads without footways. The scheme was therefore inappropriate development, and no very special circumstances were shown. Missing protected-species surveys, M25 noise and poor access visibility added to the harm.
This decision was picked up by the search on the words above, which refer to services, not to a settlement tier. generic.
Decision on the Planning Inspectorate appeals service · full decision note · letter pins-corpus/6012481.txt