39 Chalkwell Esplanade, Westcliff-on-Sea

appeal 6006985·Southend-on-Sea·1 September 2026dismissed
Decision
dismissed, 1 September 2026
Decided by
Planning Inspector: S Simms
Authority
Southend-on-Sea (East of England)
Appeal reference
6006985
Application reference
25/00621/FUL
Procedure
written representations
Development
Three-storey flat-roofed building of 3 flats with rear parking on vacant seafront plot (extant permission for 2 flats in a hipped-roof building)
Homes
3
Site context
inside settlement, PDL
Green Belt
No
Housing land supply
2.9 years
Housing Delivery Test
20%
Framework applied
August 2026 NPPF
Determinative policies
DP3(3), S4(2)
Development plan policies
Southend-on-Sea Core Strategy 2007 KP2, CP4, Development Management Document 2015 DM1, DM3, DM6, Design and Townscape Guide SPD 2009
Main issues
character and appearance

Summary

A flat-roofed, stone-and-metal-clad block of 3 flats on a vacant plot on Southend seafront. There was already permission for a hipped-roof building of 2 flats. Dismissed on character grounds. The conflict with an explicit plan design standard (the Seafront Character Zone policy) engaged DP3's refusal trigger. With substantial weight, it substantially outweighed the benefits even with a 2.9-year supply and about 20% delivery.

Issues and findings

Planning balance

S4(2) route: "the benefits of approving development are likely to be substantially outweighed by adverse effects in situations where the proposal would fail to comply with one of the national decision-making policies which state that proposals should be refused" (DL ¶15). "I attach substantial weight to this conflict, which in turn substantially outweighs the benefits of the proposal, despite the housing land shortfall and significant under-delivery" (DL ¶17). The weight given to the housing benefit was not stated.

What made the difference

DP3(3) did the work. Once the design conflicted with an explicit local character-zone standard, the inspector treated that conflict as carrying substantial weight in its own right. A severe supply position (2.9 years, about 20% delivery) and PDL reuse could not overcome it. The extant permission for a hipped-roof scheme showed that a design matching the seafront style was achievable, so the extra flat was only a marginal gain. A pitched and hipped design in matching materials would very likely have passed.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
DP3(3)failsubstantialflat roof, coastal stone and metal cladding depart from the hipped-roof seafront form protected by DM6 Seafront Character Zone 4; conflict with explicit plan design standards given substantial weight (DL 7-10, 16-17)
S4(2)failfailure of a refuse-trigger policy means benefits likely substantially outweighed (DL 15, 17)
HO7benefit3 dwellings (net +1 over extant scheme), PDL, sustainable location; weight not specified (DL 11, 14)

Key facts

Sources

This note is one of the decisions behind the NPPF 2026 Navigator, which shows how each Framework test has been applied across all the decisions in the database. Also available as Markdown.