Beacon Fen Energy Park, near Heckington, Lincolnshire (DCO)

application EN010151·North Kesteven / Boston (Lincolnshire)·21 August 2026approved
Decision
approved, 21 August 2026
Decided by
Secretary of State: Minister Curran for SoS DESNZ; ExA A Pinto
Authority
North Kesteven / Boston (Lincolnshire) (East Midlands)
Application reference
EN010151
Procedure
inquiry
Development
DCO for 400 MW ground-mounted solar PV with up to 600 MVA battery storage, access corridor and cable connection to Bicker Fen substation
Site context
open countryside, agricultural land BMV, listed building setting
Green Belt
No
Framework applied
December 2024 NPPF (transitional)
Determinative policies
NPS EN-1 5.9.32, NPS EN-1 5.11.34
Main issues
need for renewable energy; BMV agricultural land; heritage setting; landscape; compulsory acquisition

Summary

This was a DCO for a 400 MW solar farm with up to 600 MVA of battery storage near Heckington, Lincolnshire. On 21 August 2026 the Energy Secretary (Minister Curran) granted consent, in line with the Examining Authority's recommendation. The decision is recorded for how it handled the Framework switch. Four days after the August 2026 NPPF took effect, the letter still treats the NPPF as a draft under consultation and applies the December 2024 paragraph 215 to the heritage balance. There is no reference to the published 2026 Framework.

Issues and findings

Planning balance

This was the PA 2008 s104 balance under the 2024 NPSs. On one side: need (substantial), plus socio-economic and biodiversity benefits (limited each). On the other: land use and BMV (great), landscape and visual (moderate), heritage (moderate), and cumulative effects (limited). "the benefits … outweigh the totality of its adverse impacts" (DL ¶7.3).

What made the difference

On the merits, NPS need weight carried the scheme despite great negative weight for BMV loss. On the Framework question, which is why this case is recorded, the letter shows a Secretary of State decision issued after 17 Aug 2026 that did not register the new NPPF at all. It is described as a draft and the old paragraph numbering is applied. Contrast SOS-EN020032 (14 Sep), where the same department expressly acknowledged the 17 Aug Framework and kept 2024 references deliberately.

Transferable points

Policy findings

Policy codes are those of the National Planning Policy Framework (August 2026) unless a development plan is named.

PolicyFindingWeightNote
W3benefitsubstantialurgent need for renewable generation; ExA's "very great" equated to NPS "substantial" positive weight (DL 4.6, 4.9, 7.1) - assessed under NPS EN-1/EN-3, not W3 by name
HE6harmmoderateless than substantial harm (South Kyme Tower setting, Gashes Barn, non-designated farmsteads, Car Dyke); benefits outweigh; SoS raised ExA's little weight to moderate; applied as "NPPF paragraph 215" (2024) (DL 4.53-4.54, 7.2)
NPS EN-1 5.11.34harmgreatland use - 20.37 ha permanent and c.255 ha temporary (40-yr) loss of BMV land; significant cumulative BMV loss across Lincolnshire - under NPS EN-1 5.11.34 and May 2024 WMS; no 2026 code cited (DL 4.59-4.69, 7.1)
DP3harmmoderatelandscape and visual effects (DL 4.27, 7.1)

Key facts

Related decisions

Sources